Skip to main content
Close
Home

Top header menu

  • News
  • Track my job

Main navigation

  • About us
  • Construction
  • Facilities Management
  • Careers
  • Contact us
Menu
Home
Close
Contact us
  • About us
    • About us
    • Our people
    • Our Clients
    • Our community
    • Our Accreditations
    • Case Studies
    • Project Milestones
    • Our Work in Living Environments (Flipbook)
    • Our Work in Learning Environments (Flipbook)
    • Our Work in Caring Environments (Flipbook)
    • About Us
  • Construction
    • Construction
    • Extension & Expansion Projects
    • New Building Projects
  • Facilities Management
    • Facilities Management
    • Housing Maintenance
  • Careers
  • Contact us
  • News
  • Track my job

Breadcrumb

  • You are here:
  • Home
  • K2 Youth Centre
Close menu
About us
About Us
Our People
Our Clients
Our Community
Our Accreditations
Project Milestones
Close
Contact Mountjoy
Contact us

Sectors

  • Housing
  • Schools & Academies
  • College and Universities
  • Health and care
  • Leisure
  • Heritage
  • Local Goverment
  • Business and Industry
Close menu
Construction Services
Construction services
New Building Projects
Extension & Expansion Projects
Close
Contact Mountjoy
Contact us

Sectors

  • Housing
  • Schools & Academies
  • College and Universities
  • Health and care
  • Leisure
  • Heritage
  • Local Goverment
  • Business and Industry
Close menu
Facilities management
Facilities management
Housing Maintenance
Close
Contact Mountjoy
Get in touch

Sectors

  • Housing
  • Schools & Academies
  • College and Universities
  • Health and care
  • Leisure
  • Heritage
  • Local Goverment
  • Business and Industry
Entrance_to_K2

K2 Youth Centre

K2 YOUTH CENTRE, LITTLEHAMPTON

Mountjoy has been appointed to undertake the Design and Build of a brand-new youth centre at Eldon Way, in Littlehampton, West Sussex. The new building will stand directly across from the old centre, which is due to be demolished.

 

The new building will provide two large open spaces for sporting and community activities, as well as a central circulation area, kitchen and Multi Use Games Area (MUGA) and play area.

  • 2023
  • Site_Operations_Begin
    23 January 2023
    Site Operations Begin

    Site operations begin on the new K2 Youth Centre at Eldon Way, Littlehampton. Early works included the establishment of the car park and the preparation of the MUGA.

  • Councillors_and_Site_Team
    15 February 2023
    Groundbreaking Start of Project

    Mountjoy welcomed guests from Littlehampton Town Council and Arun District Council to officially kick-off the works.

  • MUGA_Tarmac_Complete
    22 February 2023
    MUGA Tarmac in place

    The tarmac on the MUGA is completed, with fencing to follow and white lines to be painted towards the end of the project ready for use.

  • Fencing_Surrounding_MUGA
    23 February 2023
    MUGA Fencing Completed

    External fencing surrounding the MUGA is completed.   

  • Foundations_Poured_for_new_building
    24 February 2023
    Building Foundations Poured

    Foundations for the new community centre have been poured in preparation for construction to begin. 

  • Steel_frame_structure_installed
    21 March 2023
    Structural Work Begins

    The team begin the construction of the steel frame structure of the building. 

  • Steel_frame_structure_complete
    28 March 2023
    Steel Frame Complete

    The steel frame structure of the building is successfully completed. 

  • Concrete_Slab_poured
    11 April 2023
    Oversite Poured

    The ground floor concrete slab of the building has now been poured. 

  • External_brickwork_laid
    18 April 2023
    Brickwork Commences

    Brickwork and blockwork walling to the external and internal walls begins. 

  • Exterior_scaffold_at_K2
    03 May 2023
    Scaffold Commences

    As brickwork continues, the installation of scaffolding begins to the outside of the building. 

  • Exterior_brickwork_at_K2_Centre
    01 June 2023
    Exterior Brickwork Complete

    Exterior brickwork is complete to a height of 2.7m. 

  • Scaffold_on_exterior_of_K2_Youth_Centre
    05 June 2023
    Scaffold Completed

    Scaffolding is completed, allowing for brickwork, cladding, and roof works to proceed. 

  • Internal_thermalite_walls_at_K2_youthcentre
    07 June 2023
    Thermalite Internal Walls Near Completion

    As work progresses, the Thermalite internal walls near full height. 

  • Kalzip_roof_sheets_and_window_opening
    16 June 2023
    Roof Liner Installed

    Kalzip roof liner is installed over the main hall, ready to recieve roof overalying rof sheet, with openings installed for Velux windows. 

  • Top_Hats_and_rails_installed_on_roof
    22 June 2023
    Roof Works Continue

    Top hats and rails are installed on the roof of the new K2 Centre. 

  • velux_windows_installed
    26 June 2023
    Velux Windows are Installed

    Velux windows are installed within the roof. 

  • timber_infills_at_K2 Youth Centre
    03 July 2023
    Timber Infills Installed

    Timber infills are installed between steels on the roof. This will provide a substructure for external cladding. 

  • Birdcage Scaffold Removed
    11 July 2023
    Birdcage Scaffold Removed

    The Birdcage scaffold is removed from the interior of the main hall. 

  • Flow_screed_in_main_hall
    17 July 2023
    Flow Screed Laid

    Flow Screed is laid, providing a level surface ready for the application of floor finishes. 

  • Marking_on_main_hall_wall
    25 July 2023
    Preparations for Electrical Installations

    Indicative markings are measured on internal walls, preparing for electrical installations. 

  • kalzip_roof_with_velux_windows
    02 August 2023
    Kalzip Roof Complete

    Kalzip roof is complete, with Velux windows installed. 

  • wall_of_keystone_centre_with_temporary_windows
    04 August 2023
    Temporary Windows Fitted

    For added security, temporary windows are fitted prior to final window installation.

  • internal_blockwork_at_K2 centre
    09 August 2023
    Internal Blockwork Complete

    Internal blockwork is complete, ready for plastering.

  • metal_studs_in_K2_centre
    14 August 2023
    Metal Studs Installed

    Metal studs are installed, ready for 1st fix Mechanical and Electrical installations. 

  • roof_insulation_at_K2 Centre
    01 September 2023
    Insulation Installed to Roof

    Insulation installed to eaves, ready for timber cladding 

  • Cross_Battens_on_exterior
    05 September 2023
    Cross Battens Installed

    Strips of timber (battens) are installed to the building exterior, ready for timber cladding to be installed on top. 

  • Thermowood_Cladding_to_K2 Exterior
    27 September 2023
    Installation of Thermowood Cladding Begun

    Works begin on installing Thermowood cladding to the exterior of the K2 Youth Centre. 

  • Trench_dug_to_side_of_K2 Centre
    29 September 2023
    Trench Dug

    A trench is dug to receive service ducts. 

  • Thermowood_Cladding
    06 October 2023
    Thermowood Cladding Completed

    Installation of Thermowood cladding to the exterior of the centre is completed. 

  • Cherry_picker
    10 October 2023
    Scaffold Removed

    Scaffold has been removed from the building exterior. A cherry picker is used on site to complete any high works. 

  • Insulation_in_K2_Interior
    12 October 2023
    Insulation Installed to Building Interior

    Insulation is installed to the interior of the building. This will later be covered when the internal walls are plasterboarded. 

  • Grasscrete_blocks_are_laid
    17 October 2023
    Grasscrete Blocks Laid

    Grasscrete blocks are laid to allow for easy access to the rear of the building. 

  • Main_Hall_of_K2_Centre
    20 October 2023
    Plastering in Main Hall Underway

    Plastering to the interior of the Main Hall is underway. 

  • large_windows_in_main_hall
    25 October 2023
    Main Hall Windows Installed

    Large windows have been installed within the Main Hall with protection added to the glass to avoid scratches. 

  • Cherry_picker_in_main_hall
    27 October 2023
    Main Hall Plastering Complete

    Plastering works within the Main Hall are completed. A cherry picker is used to paint the roof steels. 

  • Base_at_K2_Centre
    02 November 2023
    Preparation of Base

    The base layer outside the entrance to the centre is prepared, ready to receive paving slabs. 

  • main_hall_of_K2_centre
    08 November 2023
    Main Hall Walls Painted

    The Main Hall's walls and steel work is painted. 

  • kitchen_of_K2_centre
    14 November 2023
    Plastering Completed to Kitchen

    Plastering work has been completed to the walls of the K2 Centre's kitchen. 

  • kitchen_of_K2_centre
    15 November 2023
    Opening Installed for Service Hatch

    An opening is created within the wall of the K2 Centre kitchen to serve as a service hatch. 

  • Feature_wall_in_K2_Centre
    21 November 2023
    Feature Wall Painted

    A feature wall is painted within the Main Hall of the building. 

  • Patio_to_rear_of_building_laid
    24 November 2023
    Patio is Laid

    A patio is laid to the rear of the K2 Centre. 

  • Road_works_signage
    29 November 2023
    Site Entrance Works Begin

    Barriers are installed and roadworks are started to create the entrance to site. 

  • Green_sheet_over_doorway
    01 December 2023
    Door Frames Plastered

    Plastering works underway to head of door frames in the main hall. 

  • square_opening_in_wall
    06 December 2023
    Reception Opening Formed

    An opening is formed within the K2 Centre's reception, ready for a glazed screen to be installed. 

  • hanging_lights_from_K2_Centre_ceiling
    11 December 2023
    Ceiling Lighting Installed

    Ceiling lights are installed within the main hall.

  • vinyl_flooring_in_K2_Hall
    15 December 2023
    Vinyl Flooring Installed

    Vinyl flooring is laid within the main hall, 

  • external_view_of_front_of_K2_Centre_with_site_machinery
    20 December 2023
    External Works Underway

    External works including the installation of fencing, tarmacadam, and the undertaking of soft landscaping works are underway. 

  • 2024
  • screen_leading_to_reception
    08 January 2024
    Glazed Screen Installed within Reception Area

    A glazed screen is installed within the Reception area of the centre. 

  • polyurethane_floor_in_main_hall
    12 January 2024
    Polyurethane Floor Installed within Main Hall

    A polyurethane floor is installed within the main hall. 

  • Cupboard_doors_in_main_hall
    12 January 2024
    Cupboard Doors Installed

    Doors are installed for cupboards within main hall of the K2 Youth Centre. 

  • Automatic_doors_to_rear_of_youth_centre
    16 January 2024
    Rear Automatic Doors Installed

    Automatic double doors are installed to the rear of the building, leading to the patio and garden area. 

  • WCs_in_centre
    19 January 2024
    Centre WC Facilities Successfully Completed

    The K2 Youth Centre's WC facilities are successfully completed. 

  • Cycle_storage_and_seating_area
    05 February 2024
    Seating Area and Cycle Storage Installed

    A seating area and storage area for bicycles is installed to the front of the centre. 

  • rear_view_of_K2_youth_centre
    23 February 2024
    Rear View of K2 Youth Centre

    Rear view of K2 Youth Centre, showing PV panels on roof, patio and garden area, and fencing around the MUGA (Multi-Use Games Area). 

  • K2 Youth Centre Complete

    The K2 Youth Centre in Eldon Way, Littlehampton is now complete. The centre will provide facilities for sporting and community activities for people within the local community.  

Image
Mountjoy Logo

Follow us

Construction Services

  • New projects
  • Extension & Expansion projects

Facilities Management menu

  • Housing Management

Contact us

About Us

  • About us
  • Our People
  • Our Clients
  • Our Community
  • Our Accreditations
  • Case Studies
  • Project Milestones

Sectors

  • Business and Industry
  • Colleges and Universities
  • Health and Care
  • Heritage
  • Housing
  • Leisure
  • Local Goverment
  • Schools and Academies

Footer 1

  • Track my job
  • People System Login
  • Engage Login
  • Modern Slavery Act

Footer 2

  • Terms & Conditions
  • Liability Policies
  • Pay Gap Reporting
  • Privacy Policy
  • Modern Slavery Act

© 2021 Mountjoy. All rights reserved. | Website by Oyster Design